SILSuite™ | SILClass™ | SILLopa™ | SILHazop™ | SILCalc™ | SILAlarm™ | SILLife™

The
application for proof test and maintenance routine management:
• User definable functionality
for their business needs
• Flexibility to complement
an existing maintenance system
• Total maintenance
management capability if required
• Manages test and maintenance
routines for any equipment
• Assign appropriate
test/maintenance procedure to routines
• Float and priority
can be applied to routines
• Apply base date for
scheduling to individual routines
• User defined the ‘look-ahead’ scheduling
time for planning
• Provides an audit
trail of test and maintenance history
• Performs reliability
analysis based upon test results
• Stand-alone or integrated
seamlessly with the AIM SILClass™ and SILLopa™ tools
The
SILLife™ ‘front end’ application contains
the following functionality:
Each function list item can have a number of associated test routines (proof
tests) e.g. a function consisting of a pressure transmitter, logic solver and
valve may have separate proof tests for each component each with different
test intervals. In addition, a valve could have a partial closure test, a full
closure test and a leak-off test for with a different test interval.
Each function
can have a number of associated maintenance routines defined
separately from a proof test routine, an example might be
regular cleaning of the lens of an infra-red flame detector.
Testing/Maintenance
or breakdowns can result in remedial work and this can also
be scheduled, recorded, and tracked by the application.
A full
audit trail of test/maintenance and remedial work history
is available for each function and equipment reliability
may be analysed down to tag level.
User defined
references to formal Performance Standards for the equipment
if required and pre-defined operational ‘contingency
plans’ or risk assessments can be made available for
review by maintenance and operations staff to help decide
the course of action on test failure.
Multiple ‘document
type’ references for each function (e.g. ‘word’ documents,
spreadsheets, drawings etc) can be attached or linked and
viewed as required.
Comprehensive
searching, sorting, analysis and report printing is provided.
Other
available features include the ability to:
• Produce/print/export Job
Cards
• System ‘roll up’ of
multiple test types
• Assign appropriate
test/maintenance procedures to any routine
• Spreadsheet
import from other systems/databases
• Schedule test
and maintenance routines
• Define the ‘look-ahead’ scheduling
• Apply base date
for scheduling
• Enter results
of proof tests/maintenance or remedial work
• Apply float
and priority to routines
• Perform reliability
analysis based upon test results
The
following three access levels are provided:
1. Administrator
to add users and allocate their passwords.
2. Individual
user level for specified databases to which user
access is granted with full editing capability
of any functionality.
3. Read
only access for viewing data and running reports. |